Trying to be more helpful about the thread running an `unsafe-poller`
callback gets in the way of making the process sleep when multiple
threads are blocked on unsafe pollers.
Closes#2833
Prune some `with-continuation-marks` forms that aren't observable
(because the body is simple enough that it won't inspect marks). More
significantly, specialize `with-continuation-marks` forms to indicate
when the current frame is known to have no marks and to indicate
when tthe key expression is known to produce a non-impersonator.
Since `#%app` (used where an applicable structure might show up)
injects its own `procedure?` test and makes sure that that a procedure
is returned to the function position of the application, use `#3%$app`
to make Chez Scheme suppress a redundant `procedure?` check for the
appliction.
It's not clear that a thread can be descheduled without the current
thread's work counting as progress, but a descheduled thread certainly
shouldn't coun as a no-progress scheduled thread.
Only one instance of each callback is needed. Allowing them to pile up
is inefficient, and possibly it can trigger a reaction that causes
even more to pile up.
(for ([x (in-value 1 2)]) x)
should raises a run time error, not a syntax error.
Fix similar error in other in-something macros.
Fix name of in-directory, when used as a function outside a for.
Unfortunately, MZ_NORETURN spec is causing a few problems - see #2808
It would be great to fix these but due to lack of time, this is a
workaround that should keep things working until all supported
configurations accept MZ_NORETURN properly.
Use `call-consuming-continuation-attachment` to implement
`with-continuation-marks`, because that avoids duplicating
a set of checks when in tail position.
Looking at `bytes-allocated` usually works, but sometimes lets
memory use spiral out of control. Looking at `current-memory-bytes`
is more reliable, but still makes peak memoy use too high.
Combining those values doesn't limit the peak well enough.
Try the more obvious (in retrospect) approach of comparing
`bytes-allocated` changes and `current-memory-bytes` changes
separately, and triggering a GC if either grows enough.
Commit 1811193285 caused Racket CS to have much higher peak memory
use. Adjust the heuristic again to trigger a major GC when the
`current-memory-bytes` value is the post-GC `bytes-allocated` plus the
post-GC `current-memory-bytes`, which means waiting until
another `bytes-allocated` bytes are allocated (instead of waiting
until the number of newly allocated bytes also catches up to overhead,
such as unserused pages due to locked objects).
Implement a parameter as a Chez Scheme wrapper procedure,
instead of an applicable record. A wrapper procedure can be
applied more directly, saving 10-20% of the time for some
parameter lookups.